In our previous ERP planning tip, we covered time and quantity order-based modifiers to back-schedule supply requirements from demand. This previous tip dealt with the “when” and “how much” questions of planning. In this week’s tip, we cover the “what” questions of planning, which is represented by the bill of materials, or BOM (there is also an element of “how much” in BOMs).

For planning purposes, the BOM is important because it acts as a bridge between manufacturing’s production requirements and order requirements.

In a nutshell, the BOM defines the structure of components that collectively make up a final product, assembly, or sub-assembly. BOM views may be single level or multi-level. A single-level BOM shows only those components that are directly required to make the assembly. A multi-level, or indented, BOM shows multiple levels of breakdown. So, an assembly is broken down into components, some of which may be sub-assemblies that are themselves broken down into components. An example of a multi-level BOM is set out in the Appendix below.

Now that we have defined a general BOM, it becomes important to distinguish between an engineering bill of materials (EBOM) and a production bill of materials (PBOM). The distinction is important because the PBOM – and not the EBOM – is relevant for manufacturing and planning purposes.

Let’s start with the EBOM. When engineers design products, they explode the product into its component parts. This explosion is captured in an EBOM. For various reasons, EBOMs can be revised before the design makes its way to production and after it is already in production. Once a new revision is complete, the EBOM is handed off to production and becomes the new PBOM.

Manufacturing engineers then review the PBOM and adapt it to support the physical manufacturing process. The resulting PBOM is effectively a supplemented EBOM. Items included in a PBOM and that would be omitted in an EBOM can include shop supplies such as screws, nuts and paint as well as other items (see the below Appendix for a comparison of a sample EBOM and PBOM).

At a minimum, the PBOM should include the following line items:

Quantity Per: The quantity of the component required to build the parent item
Scrap Factor The amount of the component item lost during the manufacturing process
Routing Operation: The step in the manufacturing process (routing) where this component is required
Phantom Flag: For manufactured sub-assemblies, it determines whether the sub-assembly is built independently from or together with the parent assembly


The point of the story is this: a PBOM must accurately reflect the product design, build requirements and routings. From a planning perspective, the PBOM represents the actual demand requirements that the planning engine relies upon to generate supply recommendations.

Too often, companies feed inaccurate PBOMS into their planning engines. The result is poor recommendations that are either:

  1. Ignored;
  2. Or, if acted upon, lead to problems with inventory, lead times and scheduling.

In next week’s tip, we will discuss the final element of planning data accuracy – the manufacturing routing.

Appendix 1: Comparison of Multi-Level EBOM and PBOM for Bicycle

*this simplified example does not include more detailed BOM fields

EBOM: 1 Bicycle

PBOM: 1 Bicycle (Red)

2 Frame QTY 1 EA 2 Frame QTY 1 EA

2 Wheel Assembly QTY 2 EA

  • 3 Rim QTY 1 EA
  • 3 Tire QTY 1 EA
  • 3 Spokes QTY 10 EA

2 Wheel Assembly QTY 2 EA

  • 3 Rim QTY 1 EA
  • 3 Tire QTY 1 EA
  • 3 Spokes QTY 10 EA
  • 3 Nuts QTY 10 EA
  • 3 Bolts QTY 10 EA

2 Gear Assembly QTY 1 EA

  • 3 Gears QTY 2 EA
  • 3 Chain QTY 1 EA

2 Gear Assembly QTY 1 EA

  • 3 Gears QTY 2 EA
  • 3 Chain QTY 1 EA
  • 3 Nuts QTY 10 EA
  • 3 Bolts QTY 10 EA
2 Brakes QTY 2 EA 2 Brakes QTY 2 EA
2 Handlebars QTY 1 EA 2 Handlebars QTY 1 EA
2 Seat QTY 1 EA 2 Seat QTY 1 EA
  2 Red Paint QTY 0.5 GAL
  2 Bolts QTY 20 EA
  2 Screws QTY 10 EA


Your POV (post comments below)

Originally posted on Pemeco's Blog


ERP Planning Tip 3: Drive Planning Efficiency with Accurate Production Bill-of-Materials

Categories

All

General

Accessibility

Business events

Business innovation

Cloud computing

Communications

Copyright

Data centers

Digital economy strategy

Economic development Canada

eCommerce

eHealth

eLearning

Enterprise Resource Planning (ERP)

Gadgets

Geo-blocking

Green technology

Investment

Mashups

Mobility

New technologies

Olympic technology

Outsourcing

Project management

Sales and marketing

Security

SMB

Social media

Social networking

Software as a Service (SaaS)

Speakers Corner

Start Up Innovation Campaign

Tech events

Technology law

Technology start-ups

Trends

Unified Communications

Usage based billing

Web 2.0

Wireless


Archives

May 2012

April 2012

March 2012

February 2012

January 2012

December 2011

November 2011

October 2011

September 2011

August 2011

July 2011

June 2011

May 2011

April 2011

March 2011

February 2011

January 2011

December 2010

November 2010

October 2010

September 2010

August 2010

July 2010

June 2010

May 2010

April 2010

March 2010

February 2010

January 2010

August 2, 2011 7:30 AM

In our previous ERP planning tip, we covered time and quantity order-based modifiers to back-schedule supply requirements from demand. This previous tip dealt with the “when” and “how much” questions of planning. In this week’s tip, we cover the “what” questions of planning, which is represented by the bill of materials, or BOM (there is also an element of “how much” in BOMs).

For planning purposes, the BOM is important because it acts as a bridge between manufacturing’s production requirements and order requirements.

In a nutshell, the BOM defines the structure of components that collectively make up a final product, assembly, or sub-assembly. BOM views may be single level or multi-level. A single-level BOM shows only those components that are directly required to make the assembly. A multi-level, or indented, BOM shows multiple levels of breakdown. So, an assembly is broken down into components, some of which may be sub-assemblies that are themselves broken down into components. An example of a multi-level BOM is set out in the Appendix below.

Now that we have defined a general BOM, it becomes important to distinguish between an engineering bill of materials (EBOM) and a production bill of materials (PBOM). The distinction is important because the PBOM – and not the EBOM – is relevant for manufacturing and planning purposes.

Let’s start with the EBOM. When engineers design products, they explode the product into its component parts. This explosion is captured in an EBOM. For various reasons, EBOMs can be revised before the design makes its way to production and after it is already in production. Once a new revision is complete, the EBOM is handed off to production and becomes the new PBOM.

Manufacturing engineers then review the PBOM and adapt it to support the physical manufacturing process. The resulting PBOM is effectively a supplemented EBOM. Items included in a PBOM and that would be omitted in an EBOM can include shop supplies such as screws, nuts and paint as well as other items (see the below Appendix for a comparison of a sample EBOM and PBOM).

At a minimum, the PBOM should include the following line items:

Quantity Per: The quantity of the component required to build the parent item
Scrap Factor The amount of the component item lost during the manufacturing process
Routing Operation: The step in the manufacturing process (routing) where this component is required
Phantom Flag: For manufactured sub-assemblies, it determines whether the sub-assembly is built independently from or together with the parent assembly


The point of the story is this: a PBOM must accurately reflect the product design, build requirements and routings. From a planning perspective, the PBOM represents the actual demand requirements that the planning engine relies upon to generate supply recommendations.

Too often, companies feed inaccurate PBOMS into their planning engines. The result is poor recommendations that are either:

  1. Ignored;
  2. Or, if acted upon, lead to problems with inventory, lead times and scheduling.

In next week’s tip, we will discuss the final element of planning data accuracy – the manufacturing routing.

Appendix 1: Comparison of Multi-Level EBOM and PBOM for Bicycle

*this simplified example does not include more detailed BOM fields

EBOM: 1 Bicycle

PBOM: 1 Bicycle (Red)

2 Frame QTY 1 EA 2 Frame QTY 1 EA

2 Wheel Assembly QTY 2 EA

  • 3 Rim QTY 1 EA
  • 3 Tire QTY 1 EA
  • 3 Spokes QTY 10 EA

2 Wheel Assembly QTY 2 EA

  • 3 Rim QTY 1 EA
  • 3 Tire QTY 1 EA
  • 3 Spokes QTY 10 EA
  • 3 Nuts QTY 10 EA
  • 3 Bolts QTY 10 EA

2 Gear Assembly QTY 1 EA

  • 3 Gears QTY 2 EA
  • 3 Chain QTY 1 EA

2 Gear Assembly QTY 1 EA

  • 3 Gears QTY 2 EA
  • 3 Chain QTY 1 EA
  • 3 Nuts QTY 10 EA
  • 3 Bolts QTY 10 EA
2 Brakes QTY 2 EA 2 Brakes QTY 2 EA
2 Handlebars QTY 1 EA 2 Handlebars QTY 1 EA
2 Seat QTY 1 EA 2 Seat QTY 1 EA
  2 Red Paint QTY 0.5 GAL
  2 Bolts QTY 20 EA
  2 Screws QTY 10 EA


Your POV (post comments below)

  •  What organizational measures do you take to ensure that your BOMS remain accurate?
  • How has your organization transitioned from using manual planning tactics to using MRP effectively?
  • What's your organization's biggest challenge to maintaining accurate BOMs?

Originally posted on Pemeco's Blog

Blogger Profile: Jonathan Gross
Jonathan manages ERP selection projects drawing upon his experience as a commercial lawyer and his M.B.A. education to help clients select the right-fit ERP systems and negotiate the best deal. He is an industry analyst and advises boards of directors on issues relating to business, strategy and law.

Posted by Sue Ansell at August 2, 2011 7:30 AM

Categories: Enterprise Resource Planning (ERP)

Comments

Name
URL (remove the http://)
Email
Comments (field is limited to 2000 characters)
   

TrackBack Link

Bookmark and Share           Print Page          Email To A Friend
Start Me Up Innovation Campaign winner

WCIT C200 Investment Forum


Insightful business speaker Jim Harris talks innovation in 
Speaker's Corner 

Backbone magazine Speakers' Corner 

Backbone magazine latest digital issue

Backbone's Cloud Portal

Backbone's Digital Economy Acceleration Committee

Backbonemag on Twitter